Construction Specifications
₹2500 / sq.ft
Foundation & Structure
- Random rubble: Foundation (60x60cm dry), Basement (45x45cm C.M)
- Leveling bed, Earth filling with compacted sand (slurry)
- RCC belt work 1:2:4 (45x10/15cm)
- RCC columns 1:2:4 in sit-out
Superstructure & Finishing
- Cement Block work in C.M. 1:7 (30x20x15cm), 3m/floor
- RCC 1:2:4 slab, shade, stair, beam, lintel
- Main slab: 8mm TMT @ 15cm c/c, 10cm thick
- Shade: 50mm thick, Lintel: 150mm thick
- Waterproofing (Dr. Fixit) for sunken slab
- Plastering: Walls (15mm), Ceiling (12mm)
- Cup board Work
Flooring & Tiling
- PCC 1:4:8, 20mm metal, 5cm thick
- Vitrified tiles ₹50/sqft (8x2)
- Skirting: 4", matching tiles
- Kitchen: Anti-skid ceramic tiles ₹50/sqft
- Toilets: Anti-skid 30x30cm tiles (max ₹50/sqft), epoxy finish
Woodwork & Doors
- Main Door: Teak wood
- Windows: Plavu or Aini
- Internal Doors: Plavu or Aini Door
- Toilet Doors: Sintex (₹3,000 max)
Electrical & Plumbing
- KSEB - single-phase, DB, ELCB/MCB
- Bedroom/Dining/Living: Light, Fan, Socket, TV, AC Points
- Kitchen: Lights, Exhaust, Fridge, Inverter, Purifier
- 3-layer water tank (1000 L) - ₹6,000
- Sanitary fittings as per drawing
- 3 Drainage pits
- Switches (GM, Vguard)
Painting Works
- Applying Putty - 1 coat
- Applying white cement - 1 coat
- Applying primer - 1 coat