Construction Specifications

₹2200 / sq.ft

Foundation & Structure
  • Random rubble: Foundation (60x60cm dry), Basement (45x45cm C.M)
  • Leveling bed, Earth filling with compacted sand (slurry)
  • RCC belt work 1:2:4 (45x10/15cm)
  • RCC columns 1:2:4 in sit-out
Superstructure & Finishing
  • Cement Block work in C.M. 1:7 (30x20x15cm), 3m/floor
  • RCC 1:2:4 slab, shade, stair, beam, lintel
  • Main slab: 8mm TMT @ 15cm c/c, 10cm thick
  • Shade: 50mm thick, Lintel: 150mm thick
  • Waterproofing (Dr. Fixit) for sunken slab
  • Plastering: Walls (15mm), Ceiling (12mm)
Flooring & Tiling
  • PCC 1:4:8, 20mm metal, 5cm thick
  • Vitrified tiles ₹35/sqft (4x2)
  • Skirting: 4", matching tiles
  • Kitchen: Anti-skid ceramic tiles ₹35/sqft
  • Toilets: Anti-skid 30x30cm tiles (max ₹40/sqft), epoxy finish (Single Type)
Woodwork & Doors
  • Main Door: Plavu, Aini
  • Windows: Aini frame, Anjali shutter, 3.5mm glass
  • Internal Doors: Aini frame, membrane shutters
  • Toilet Doors: Sintex (₹2500 max)
Electrical & Plumbing
  • KSEB - single-phase, DB, ELCB/MCB
  • Bedroom/Dining/Living: Light, Fan, Socket, TV, AC Points
  • Kitchen: Lights, Exhaust, Fridge, Inverter, Purifier
  • 3-layer water tank (1000 L) - ₹6,000
  • Sanitary fittings as per drawing
  • 3 Drainage pits
  • Switches (GM)
Painting Works
  • Applying Putty - 1 coat
  • Applying white cement - 1 coat
  • Applying primer - 1 coat